Panasonic Attune II Installationsanleitung Seite 21

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 84
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 20
21
Installation procedures
w Deciding on where to install the Center Module
Select a wall on which to mount this unit, drill a hole in it to pass the wires through, and decide where the four screws are to be
positioned, as shown below.
190
1352540
200
5
p Ensure that the installation surface has the pull-out strength below.
Important
w Installation
 Mount this unit using the accessory wall mounting bracket and 4 screws (4.1 mm × 25 mm
{5/32 inches × 63/64 inches}).
[Minimum pull-out strength: 780 N {80 kJf}]
Screws (locally procured)
(wood screws:
4.1 mm × 25 mm
{5/32 inches × 63/64 inches})
Wire channel
English
Seitenansicht 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 83 84

Kommentare zu diesen Handbüchern

Keine Kommentare