Panasonic WJ-GXE100 Installationsanleitung Seite 14

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 13
14
Major operating controls
12 V DC
power supply terminal
Network connector
Live indicator
INITIAL SET button
Mounting hole q
Mounting hole w
Ventilation area
(also on the other side of the unit)
About the [INITIAL SET] button
After turning off the power of the unit, turn on the power of the unit while holding down this button,
and wait for around 5 seconds or more without releasing this button. Wait around 2 minutes after
releasing the button. The unit will start up and the settings including the network settings will be ini-
tialized. Do not turn off the power of the unit during the process of the initialization. Before initializing
the settings, it is recommended to write down the settings in advance.
<About the live indicator>
When the power is
turned on
Lights green
When connected to a
network (not accessed)
Lights orange
When connected to a
network (accessed)
Blinks orange/
Blinks green
Seitenansicht 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 31 32

Kommentare zu diesen Handbüchern

Keine Kommentare